Stormwater Management for Land Development Projects
Dunnville Shopping Centres
Dunnville, Ontario
- stormwater management for a 7 ha commercial development
- incorporation of design elements necessary for meeting the requirements related to a "provincially significant wetland" and hazardous land" in terms of flood risks
Hamilton Mountain Development Hamilton, Ontario
- stormwater management for a 12 ha commercial development
- development of a SWM plan confirming to the regional SWM strategy for a 110 ha planning area
Oshawa South Commercial Development Oshawa, Ontario
- stormwater management for a 19 ha commercial development
- development of a SWM plan constrained by downstream backwater conditions
Lansdowne Place Development Peterborough, Ontario
- re-development of a 14 ha commercial property
- development of an improved SWM plan for the subject property and external areas
Othello Shopping Centres Stratford, Ontario
- Functional Servicing Report, including a stormwater management plan for an 8 ha commercial development
- development of a SWM plan based on peak flow overcontrol due to downstream sewer constraints
Tullamore Business Park
Caledon, Ontario
- SWM plan an design for a 27 ha commercial development and 32 ha of external area
- detail design of a 37,000 cubic metre wet pond facility and other runoff controls
Scarborough Town Centre - Block D&E
Scarborough, Ontario
- stormwater management for a 4 ha commercial development
- design of runoff quality and quantity control facilities
East Banwell Development
Windsor, Ontario
- development of a stormwater management plan for a 15 ha residential and commercial subdivision
- evaluation of various alternatives, including sand filters and inltration basins
Neilly Subdivision
Innisfil, Ontario
- development and evaluation of various alternatives for stormwater management in support of a 10 ha residential development
- design of SWM facilities, suitable for incorporation into a rural environment
Sutton Commercial Development
Sutton, Ontario
- stormwater management plan for a 1 ha commercial development, constrained by downstream flooding and spatial conditions
Canadian Waste Services’ Wentworth Court Facility
Brampton, Ontario
- stormwater management plan for a 4 ha waste processing site
- design of parking lot storage for runoff quantity control
- design of quality control facilities
Oak Ridges Farm Co-Tenancy
Oak Ridges, Ontario
- over 270 ha of environmentally very sensitive area containing numerous natural wetlands (Oak Ridges Moraine)
- development of stormwater management strategy
- development of quality and quantity control measures
|